Technical Accuracy Review (Expert Pass)
Date: 2026-03-10
Scope: technical-training/*.md, technical-training/journal-club/index.md, dictionary and unit structure docs
Findings (ordered by severity)
- Medium - Overstatement in journal club framing of early connectome completeness.
- Location:
technical-training/journal-club/index.md - Issue: wording implied absolute completeness.
- Action: revised to “first near-complete wiring map”.
- Location:
- Low - Manifest/thumbnail mismatches for several selected figure IDs.
- Locations:
07-glia,06-axons-and-dendrites,08-segmentation-and-proofreading, selected figure lists. - Issue: some CSV-listed figure IDs are not present as extracted thumbnail files.
- Action: replaced with nearest available alternatives and documented substitutions on-page.
- Locations:
- Low - Historical benchmark/tool claims need explicit temporal framing.
- Locations:
09-connectome-analysis-neuroaicontent/captions. - Issue: risk of readers interpreting 2021 claims as current-state guarantees.
- Action: added historical-context notes and caution language.
- Locations:
Residual risks
- Some references and tool-performance claims are historical and should be revalidated before final publication.
- Extracted figure availability is currently dependent on package completeness; missing IDs remain unresolved.
Result
- No high-severity technical errors detected after revisions.
- Content is technically coherent for draft instructional use.