04 Volume Reconstruction Infrastructure

Technical Training: Nanoscale Connectomics


Session outcomes (60 minutes)


Pedagogical arc


Reference architecture

Ingest -> Transform -> Inference -> Post-process -> Serving

Reliability and lineage are first-class scientific requirements.


Visual context: pipeline overview

w:940


Visual context: orchestration and stage dependencies

w:940


Visual context: serving and analysis interface

w:940


Data contracts and lineage (minimum fields)

Without this, outputs are not auditable science.


Orchestration essentials


Reliability SLOs tied to science


Failure modes and containment


Tabletop exercise (10 min)

Given a failed post-process stage:

  1. decide rollback scope,
  2. identify required lineage fields,
  3. define release hold criteria.

Activity deliverable

One pipeline diagram including:


Rubric checkpoint


External paper figure slots


Bridge

Next unit: ultrastructure interpretation on top of trusted reconstruction output.